The planning is underway; the redesign of the Rhine riverbank in St. Goar is scheduled to begin in 2022. This is later than originally planned, but „What takes a long time sometimes turns out well. And in this case, I think, quite excellently,“ said Mayor Falko Hönisch.
Further