{"id":6744,"date":"2026-02-24T14:30:12","date_gmt":"2026-02-24T13:30:12","guid":{"rendered":"https:\/\/www.stadt-st-goar.de\/?p=6744"},"modified":"2026-02-24T14:30:14","modified_gmt":"2026-02-24T13:30:14","slug":"ak-child-daycare-center-held-a-meeting-regarding-the-new-daycare-center-in-fellen","status":"publish","type":"post","link":"https:\/\/www.stadt-st-goar.de\/en\/ak-kindertagesstaetten-tagte-zum-kita-neubau-in-fellen\/","title":{"rendered":"AK Childcare Centres met to discuss the new daycare building in Fellen"},"content":{"rendered":"<figure class=\"wp-block-image size-large is-resized\"><img loading=\"lazy\" decoding=\"async\" src=\"https:\/\/www.stadt-st-goar.de\/wp-content\/uploads\/2025\/12\/nursery-pixabay_LRCL-1024x683.jpg\" alt=\"Kindergarten Working Group\" class=\"wp-image-6595\" width=\"624\" height=\"416\" srcset=\"https:\/\/www.stadt-st-goar.de\/wp-content\/uploads\/2025\/12\/nursery-pixabay_LRCL-1024x683.jpg 1024w, https:\/\/www.stadt-st-goar.de\/wp-content\/uploads\/2025\/12\/nursery-pixabay_LRCL-300x200.jpg 300w, https:\/\/www.stadt-st-goar.de\/wp-content\/uploads\/2025\/12\/nursery-pixabay_LRCL-768x512.jpg 768w, https:\/\/www.stadt-st-goar.de\/wp-content\/uploads\/2025\/12\/nursery-pixabay_LRCL-1536x1024.jpg 1536w, https:\/\/www.stadt-st-goar.de\/wp-content\/uploads\/2025\/12\/nursery-pixabay_LRCL.jpg 1920w\" sizes=\"auto, (max-width: 624px) 100vw, 624px\" \/><figcaption class=\"wp-element-caption\">Kindergarten Working Group<\/figcaption><\/figure>\n\n\n\n<p class=\"wp-block-paragraph\">On Friday, February 20, 2026, the \u201eKindergartens\u201c working group of the city of Sankt Goar once again met for a meeting. The focus was on jointly reviewing the current status of the feasibility study for the planned construction of a new kindergarten in Sankt Goar-Fellen.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">In addition to the city mayor Falko H\u00f6nisch, members of the city council and committees, the kindergarten management and interested citizens, the commissioned architectural firm Becker &amp; Elbert, represented by Mr. Elbert from Koblenz, also participated. The aim of the meeting was to discuss the planning status in advance of an official presentation in the city council and committees, to clarify open points and to include further suggestions.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">At the beginning, upon request, Mr. H\u00f6nisch informed about the status of a possible container or interim solution.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">In the further course of the meeting, Mr. Elbert presented two possible variants for the new kindergarten in Sankt Goar-Fellen, including a community room. The basis of the planning is a required interior space requirement of approximately 1,200 m\u00b2. According to the planners\u2019 assessment, both variants are feasible to implement as two-story buildings and offer the option of expanding to a sixth group in the future.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Option 1 (without bus detour)<\/strong>&nbsp;The project includes an outdoor area of approximately 1,600 m\u00b2 and 11 parking spaces for cars. Additionally, an additional internal courtyard could be created. The planned community space covers approximately 83 m\u00b2.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Option 2 (with bus detour loop)<\/strong>&nbsp;would provide an outdoor area of approximately 1,300 m\u00b2 and 9 parking spaces for cars. The community space would be slightly smaller here, with approximately 71 m\u00b2. A bus stop would be conceivable, but this also depends heavily on the operation of the daycare center.<br><br>In this context, the possibility of establishing a bus service at the end of the Fellen locality was also discussed with the district administration.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">In both variants, a wall is created towards the railway, which is also intended to be a playable outdoor area for the children.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">It was noted among the participants that in essence, all the suggestions from the previous meetings and the input received from the architectural office could be implemented in one form or another.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The results of this interim feasibility study are now to be presented to the city council and the relevant committees. The goal remains to ensure sustainable and demand-oriented childcare in Sankt Goar-Fellen.<\/p>\n\n\n\n<figure class=\"wp-block-image size-full is-resized\"><img loading=\"lazy\" decoding=\"async\" src=\"https:\/\/www.stadt-st-goar.de\/wp-content\/uploads\/2026\/02\/KITA_Plan.jpg\" alt=\"Schematic diagram\" class=\"wp-image-6745\" width=\"1082\" height=\"1331\" srcset=\"https:\/\/www.stadt-st-goar.de\/wp-content\/uploads\/2026\/02\/KITA_Plan.jpg 605w, https:\/\/www.stadt-st-goar.de\/wp-content\/uploads\/2026\/02\/KITA_Plan-244x300.jpg 244w\" sizes=\"auto, (max-width: 1082px) 100vw, 1082px\" \/><figcaption class=\"wp-element-caption\">Schematic diagram<\/figcaption><\/figure>\n\n\n\n<p class=\"wp-block-paragraph\">Photos: City of Sankt Goar<\/p>","protected":false},"excerpt":{"rendered":"<p>Am Freitag, 20. Februar 2026, kam der Arbeitskreis \u201eKindertagesst\u00e4tten\u201c der Stadt Sankt Goar wieder zu einem Treffen zusammen. Im Mittelpunkt stand die gemeinsame Beratung des aktuellen Stands der Machbarkeitsstudie f\u00fcr den geplanten Neubau einer Kindertagesst\u00e4tte in Sankt Goar-Fellen. Neben dem<\/p>","protected":false},"author":6,"featured_media":6595,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[63,49],"tags":[],"class_list":["post-6744","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-aktuelles","category-news","","tg-column-third"],"_links":{"self":[{"href":"https:\/\/www.stadt-st-goar.de\/en\/wp-json\/wp\/v2\/posts\/6744","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.stadt-st-goar.de\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.stadt-st-goar.de\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.stadt-st-goar.de\/en\/wp-json\/wp\/v2\/users\/6"}],"replies":[{"embeddable":true,"href":"https:\/\/www.stadt-st-goar.de\/en\/wp-json\/wp\/v2\/comments?post=6744"}],"version-history":[{"count":4,"href":"https:\/\/www.stadt-st-goar.de\/en\/wp-json\/wp\/v2\/posts\/6744\/revisions"}],"predecessor-version":[{"id":6749,"href":"https:\/\/www.stadt-st-goar.de\/en\/wp-json\/wp\/v2\/posts\/6744\/revisions\/6749"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.stadt-st-goar.de\/en\/wp-json\/wp\/v2\/media\/6595"}],"wp:attachment":[{"href":"https:\/\/www.stadt-st-goar.de\/en\/wp-json\/wp\/v2\/media?parent=6744"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.stadt-st-goar.de\/en\/wp-json\/wp\/v2\/categories?post=6744"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.stadt-st-goar.de\/en\/wp-json\/wp\/v2\/tags?post=6744"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}